Fords Theater

Fords Theater

Furnish, install and dismantle scaffold to access the entire facade. Washington, DC

National Presbyterian Church

National Presbyterian Church

Furnish and install scaffold for the exterior facade of the church and the 175' bell tower (exterior and interior) with stair tower access to the work decks. Washington, D.C.

National Academy of Science

National Academy of Science

Scaffold the entire perimeter of the building, auditoriums and Great Hall. Multiple dance floor work platforms. Washington, D.C.

National Park Seminary

National Park Seminary

Furnish, install and dismantle 125' tall scaffold for the removal of the top 10' of the stack. Silver Spring, MD

Bethell Church

Bethell Church

Furnish, install and dismantle scaffold around 4 sides of the bell tower. Red Lion, PA

University of Delaware

University of Delaware

Furnish, install and dismantle scaffold on both sides of press box. Newark, DE

Erickson Living

Erickson Living

Installed scaffolding in two phases with board bracket outriggers to access the exterior walls. Stair tower was provided to access fully planked work decks. Scaffold included two staging platform bays to accommodate hoist. Overhead protection was installed for all building entrances. Catonsville, MD

Roland Park Elementary School

Roland Park Elementary School

Installed scaffold around the entire perimeter in four phases. Fully planked work decks with stair tower access were provided at the roofs edge with debris chute. Safety plywood enclosure was installed at base of stair tower. Construction debris netting provided from top hand rail to work deck. Overhead protection covered each building entrance. Baltimore, MD

Stemmers Run Middle School

Stemmers Run Middle School

Scaffold dance floor installed (elevated work platform) approximately 4800 square feet inside the auditorium to access the ceiling. Stair tower provided access to the work platform. Essex, MD

Atery Plaza

Atery Plaza

Engineered wall bracing system to support the structure and provided shoring two levels below grade. Bethesda, MD

Paca Street

Paca Street

Scaffold to access the exterior facade with overhead protection and debris netting. Baltimore, MD

Compromise Street

Compromise Street

Shoring towers installed to support roof joists. Annapolis, MD

Eutaw Street

Eutaw Street

Furnished and installed scaffold with stair tower access to clean hotel after stem pipe exploded under the roadway. Baltimore, MD

Capital Street

Capital Street

Shoring installed to support roof joists. Washington, DC